-Advertisement-

84 inch diameter water line repair work at KU to complete by Saturday Evening: CEO KW&SC

- Advertisement -

Chief Operating Officer of the Water Corporation (KW&SC), Engineer Asadullah Khan, visited the University of Karachi on Thursday to inspect damaged water supply line. He was briefed by Chief Engineer WTM Zafar Palejo on the ongoing repair work.

According to the KW&SC spokesperson, the COO reviewed the pace, quality, and available resources for the repairs. He instructed officials to ensure that the restoration work is completed by Saturday evening to resume water supply to the university without delay.

- Advertisement -

Read also: Karachi Braces for Four-Day Water Shortage as KWSC Begins Major Pipeline Repair

Engineer Asadullah Khan emphasized that no further delays would be tolerated and ordered continuous monitoring of the repairs. Chief Engineer Palejo assured that the work would be completed on schedule. The spokesperson added that all available resources are being utilized to restore water supply to the university promptly.

- Advertisement -

Stay updated with the latest and breaking news directly on your mobile phone by joining Headline PK's WhatsApp group!

 

 

Latest stories

-Advertisement-

Highlights of the Week
Related

Trump Announces 10% Tariffs on Denmark, EU States Linked to Greenland Issue

US President Donald J. Trump has announced plans to...

33 Reported Missing After Deadly Fire at Karachi’s Gul Plaza

At least 33 people have been reported missing following...

OGDC Announces Major Oil and Gas Discovery in KP’s Nashpa Block

Oil and Gas Development Company Limited (OGDC) on Tuesday...

Aga Khan University Installs Princess Zahra Aga Khan as Pro-Chancellor

The Aga Khan University graduated 461 students from 18...
-Advertisement-